Contact Details Contact Details

Downloads

Permits - read water Act 
Boreholes completion
Borehole/Well/Spring in a Subterranean Water Control Areaor a Public Stream-001
Utilize a Controlled Water Source-002
Industrial Water-003

Water Services Water Services

Rural Water Supply Programmes & Services

Permits

  1. Boreholes completion

  2. Borehole/Well/Spring in a Subterranean Water Control Area or a Public Stream-001

  3. Utilize a Controlled Water Source-002

  4. Industrial Water-003

Programmes

Water Points Management

  • Promoting Community based Management (CBM)

  • Improving cost recovery on the pipeline schemes

Critically assess the identified and the application of mechanism that will improve the payment of community bills on pipeline scheme

  • Community Training

Local Water Committee

Ensure the translation of community training manuals into local languages is undertaken

Rural Water Supply Infrastructure Development

  • Construction of dams, drilling of boreholes

Appoint consultant per Group Site inspection, REJECT or ACCEPT site

Design and Cost estimate

  • Construction Pipelines schemes

Onambutu WS Phase 3

Onambutu WS Phase 4

Tsandi WSS Phase 3 – Otamanzi

Otjikoto Scheme

Waterberg WSS Phase 2

Ogongo – Oshakati (Rehabilitation

Small pipelines (Rehabilitation)

Bulk WaterSupply Infrastructure Development

Construction of dams, drilling of boreholes and Construction of pipelines schemes

  • Water Supply to Aus

  • Water Supply to Grunau

  • Construction of Large Dams (Neckertal dam)

Strategic Water Supply Infrastructure Development

Projects: Development of Desalination strategies

activities: Appoint Consultants for Planning and Design reports in collaboration with NamWater